An example is the fastest way to see whether your own SWMS is specific enough. Below are the kinds of hazard and control rows that hold up when a principal contractor or a regulator reads them: one hazard per row, the control naming what is physically in place, and a residual risk that shows the control does something.
What a good row looks like
Take one line from an electrical job:
| Hazard | Risk before | Control measure | Residual |
|---|---|---|---|
| Live conductors in the switchboard being worked on | High | Isolate the supply, lock out and tag, and test for dead with a proving unit before work starts | Low |
Three things make that row work. The hazard names the actual energy source rather than "electrical hazard". The control is a sequence someone can check. And the residual risk drops because of a specific action, not because the worker promises to be careful.
The same hazard written as "electrical hazard - ensure caution" would fail the same review.
Electrical
| Hazard | Risk before | Control measure | Residual |
|---|---|---|---|
| Live conductors in the board being worked on | High | Isolate, lock out and tag, test for dead with a proving unit | Low |
| Reaching ceiling services at height | Medium | Podium step with rails on level ground; ladder tied off and footed for short access | Low |
Plumbing
| Hazard | Risk before | Control measure | Residual |
|---|---|---|---|
| Entering a pit, tank or roof space | High | Atmosphere tested first, gas monitor worn, standby person outside with a rescue plan | Medium |
| Brazing near flammable material | High | Fire blanket and extinguisher on hand, 10 m clearance, area watched for 30 minutes after | Low |
Carpentry
| Hazard | Risk before | Control measure | Residual |
|---|---|---|---|
| Circular saw and nail gun use | High | Guards fitted, push stick for narrow cuts, hearing and eye protection, gun never pointed at anyone | Medium |
| Working at height on framing or scaffold | High | Guard rails and toe boards, harness to an anchor point, scaffold tagged and inspected | Medium |
Concreting
| Hazard | Risk before | Control measure | Residual |
|---|---|---|---|
| Wet concrete on skin and eyes | Medium | Waterproof gloves and boots, long sleeves, wash station on site | Low |
| Concrete pump boom over the work area | High | Exclusion zone under the boom, spotter in radio contact with the pump operator | Medium |
Roofing
| Hazard | Risk before | Control measure | Residual |
|---|---|---|---|
| Falling from the roof edge or a penetration | High | Perimeter rail or safety mesh, penetration covers fixed, harness and anchor point | Medium |
| Heat, sun and fatigue on the roof | Medium | Early start, water and shade on the roof, crews rotated, UV protection | Low |
Excavation
| Hazard | Risk before | Control measure | Residual |
|---|---|---|---|
| Trench collapse on a person inside it | High | Batter or shore the trench, spoil back 1 m from the edge, daily inspection by a competent person | Medium |
| Striking underground services | High | Dial Before You Dig plans on site, hand expose within 1 m, spotter beside the operator | Medium |
Filling the rest of the form
The hazard rows are the middle of the document, not the whole thing. Before them sit the company details, the ABN, the principal contractor, the site address and the activity. After them come the consultation record and the signatures. A row set that is perfect but attached to a document that does not name the site is still going to come back.
Two habits make the difference. Write the hazard in the words the crew uses, not in regulator language. And name the person or the check, not just the control: "checked by the supervisor before first ascent" beats "harness to be used".
Turn one of these into your own
The free SWMS builder loads the starting rows for six trades — electrical, plumbing, carpentry, concreting, roofing and excavation — and lets you edit every one, add your own, sign on the phone and export an A4 PDF. If you want the surrounding rules first, read what a SWMS has to contain.
Common questions
How many hazards should a SWMS list?
Two to eight rows is typical for a single activity. The number matters less than whether each hazard on the site is covered by a row, and whether every row has a control that is actually in place.
Do I need a risk rating for each row?
A risk matrix is not mandatory in the document itself, but most principal contractors expect a before and after rating. The value is in showing that the control reduces the risk, not in the numbers themselves.
What happens if the site changes after it was signed?
Edit the rows, re-sign and keep the superseded version. The signed document should always match the controls that are actually in place on site.