How to use the SWMS generator
The builder is one page because a SWMS is one page of thinking. Start with the job details, because a SWMS that does not name the site and the activity will be sent straight back by a principal contractor.
- Job details. Company, ABN if you have one, principal contractor, site address, the date, and who prepared the document.
- Work activity. Pick the trade and describe the activity in one line, in the words the crew on site would use.
- Hazards and controls. The library loads a starting set. Change any row, delete what does not apply, and add what it missed. A control measure should say what is physically in place, not that workers will be careful.
- Consultation and signatures. List the workers you talked it through with, then hand the phone over. Signature and date are captured with the row.
- Export. Download the PDF, or copy the share link and send it to the principal contractor.
What the PDF contains
The export is a single A4 document with a title block, the company and project details, the work activity, a numbered hazard and control table with a risk rating before and after controls, and a signature block for the workers and the supervisor. Nothing is watermarked and nothing is locked, so you can print it, file it in the site folder, or attach it to an induction pack.
If the job changes, reopen the saved document, edit the rows, and sign again — the old version stays in the archive on your device, so you have a record of what was in place at the time.
Where your information goes
Nowhere. The form, the signatures and the PDF are all built inside your browser: the browser draws the PDF itself, so no document is sent to a server. Drafts and finished documents are saved in your own browser storage on that device, which is why they survive closing the tab but will not follow you to another computer. Share links carry the document data inside the link itself.
That also means a cleared browser cache clears your drafts. On a shared site phone, export the PDF before you hand the phone back.
Getting the wording right
Regulators want the hazard and the control on the same line, and they want the control to be specific to this site. “Work at height — harness anchored to the engineered anchor point at grid C4, checked by the supervisor before first ascent” is worth ten lines of general procedure. The trade examples show how that reads in practice, and the guide to what a SWMS must contain sets out the four things a reviewer looks for.
Frequently asked
Which trades have a hazard library?
Six trade libraries are built in - electrical, plumbing, carpentry, concreting, roofing and excavation - with two starting rows each. Any other trade still gets the full form, you just write the rows yourself, and every loaded row can be edited or deleted.
Is the signed PDF uploaded to your server?
No. The PDF is assembled in your browser by a script library that runs locally, and your draft sits in your own browser storage. That is also why the archive does not follow you to another device.
Is this SWMS legally compliant?
It is a working document you can sign, print and file. Whether it satisfies your regulator or principal contractor depends on whether the hazards and controls describe the actual site, and on your state or territory requirements, so check it before work starts.
Can I edit a SWMS after it is signed?
Save the draft in the archive at the bottom of the builder, then open it again and edit the rows. Sign again after the change so the signed version matches what is in place.